Our Process
Process for Modular Prefab Construction

Process for On-Site Prefab Construction

Material Specification
Modular Unit
Wall Layer
- WPC/GI/ACP Cladding
- Cement board panel
- Moisture barrier
- Steel framing
- Rock wool insulation
- Polynum insulation sheet
- Calcium silicate/
Cement board panel
Floor Layer
- Decking sheet
- Concrete layer
- Tile/Wooden
flooring
Roof layer
- Concrete layer
- Decking Sheet
- Rock wool insulation
- Gypsum board
Modular Unit

Wall Layer
- WPC/GI/ACP Cladding
- Cement board panel
- Moisture barrier
- Steel framing
- Rock wool insulation
- Polynum insulation sheet
- Calcium silicate/
Cement board panel
Floor Layer
- Decking sheet
- Concrete layer
- Tile/Wooden
flooring
Roof layer
- Concrete layer
- Decking Sheet
- Rock wool insulation
- Gypsum board
Container Unit

Wall Layer
- Container sheet/corrugated
sheet - MS section framing
- Rock wool insulation
- Polynum insulation sheet
- Calcium silicate/cement board panel
Floor Layer
- Concrete layer
- Vitrified tile/wooden flooring
Roof Layer
- Container sheet/corrugated sheet
- MS section framing
- Rock wool insulation
- Polynum insulation
- Gypsum board
Why Modular?
Features | Traditional Build [Civil] | Modular Prefab Construction (Recommended) | Onsite PreFab Construction |
---|---|---|---|
Process | 100% built on site | 90% built in the factory, 10% Onsite work | 30% built in factory, 70% built onsite |
Quality | Quality can vary due to site conditions and labour | Higher quality standards with precision workmanship | Predictable quality but finishes based on skilled labour |
Portability | Immovable structures with no options post construction | Completely movable structures with option to relocate | Semi-Portable structure, can retain 50% of the structure |
Sustainability | High carbon footprint as multiple teams have to visit all sites | Lower carbon footprint as multiple teams have to visit factory | Lower carbon footprint than Traditional build |
Build Environment | Subject to site related conditions Rain, Electricity & Water | Independent of site related conditions due to factory environment | Subject to site related conditions Rain, Electricity & Water |
Raw Material | Concrete does not biodegrade for 100+ years | MS Steel Modular, Cement board with External ACP or GI cladding | Steel Prefab structure with cement board exterior board |
Reuse and Resell | Cannot be re-used and value of build depreciates every year | Can be re-used and very high scrap value. | Can be re-used and very high scrap value. |